How long would it take Ram and Shyam to complete work together?

How long would it take Ram and Shyam to complete work together?

R and S take 12 days to complete a piece of work when they work together. Ram is 50\% quicker than Shyam and therefore would do 60\% of the work. So it would take 12 days if they worked together. , Ph.D. in Civil Engineering. Maths keeps one mentally active. Ram can do (1/20)th of the work in a day, Shyam can do (1/30)th of the work in a day.

How long does it take a to do a piece of work?

A can do a piece of work in 15 days and B alone can do it in 10 days. B works at it for 5 days and then leaves. A alone can finish the remaining work in | Time and Work Questions Answers MCQ | Quantitative Aptitude

READ ALSO:   Why does my saliva get thick after I drink water?

How much more efficient is RAM than Shyam?

Ram is 100 \% efficient with his 20 man days each day he produces 5 \% as 20 days /100\% Shyam is only 50\% efficient when compared to Ram , as a result of this Shyam takes 30 man days to complete the same amount of work.each day Shyam produces 3.33 \% per day for 30 days

How much work can ram and Hari do in 6 days?

No way to answer. Basic type of problem. Ram can do 1/10 of the work each day, and Hari can do 1/15 of the work each day. Together they can do 1/10 + 1/15 = 25/150 = 1/6 of the work each day. Working together they can do the work in 6 days.

How many days does it take to do one bit of work?

Shyam takes 30 days to do one bit of work. So, he is working at a rate of 1/30 of work per day. Together, both are completing 1/20 and 1/30 of the work. 1/20 + 1/30= 5/60 = 1/12 (cross multiplication method). Therefore, their rate together is 1/12 of the work per day. So, it will take them 12 days in total.

READ ALSO:   What does the phrase righty tighty lefty loosey mean?

How much time would C take to complete the whole work?

Then calculate in how much time C would complete the whole work? A work for 4 days, B work for 7 days then A and B work together for 4 days. B work for 7 days, C work for 10 days then B and C work together for 3 days. Hence, C can complete the work in 60/4 = 15 days .

How much does the work load increase from 10 to 16?

Workload increases by 60\% from 10 to 16. So, it increases by 4 hours/day extra. Question 14: A start a work and left after 2 days and remaining work is done by B in 9 days. If A left after 3 days then B complete the remaining work in 6 days. Then in how many days A and B can complete the work individually.

How many days will it take Rajesh and Suresh to build the wall?

Rajesh can build a wall alone in 20 days and Suresh alone can build it in 15 days. If Rajesh and Suresh works together, in how many days they can finish the wall? Good Job!

READ ALSO:   Is there any disadvantage on the existence of carnivorous plants?